top of page
Search

Collaboration with Pictured Rocks Kayaking to build Special Purpose Vessel

Moran Iron Works to build First Ever Kayak Launching Vessel in the Great Lakes


ONAWAY, MI: Moran Iron Works, Inc. (MIW) has signed a contract with Pictured Rocks Kayaking (PRK) to build a specialized passenger tour vessel. Together, and in conjunction with DLBA (a division of Gibbs & Cox, Inc.), they are creating a special purpose tour boat that is first of its kind in the Great Lakes region.

The 64’ by 19’ vessel will be constructed out of aluminum at Moran Iron Works’ headquarters in Onaway, Michigan. The purpose of this particular unnamed vessel is to escort 72 passengers and 36 kayaks around Pictured Rocks National Lakeshore for guided kayak tours. This vessel will feature a custom-designed kayak launch system that is tailored to meet the specific needs of offshore kayak launching.


“Fabrication officially began with the laying of the deck plate on December 6, 2018,” said Lee Fayssoux, project manager at MIW. “This is a very exciting project for us. It is a real privilege to have an ‘Inspired by Michigan’ vessel in our shop. This vessel will not only be capable of carrying passengers, but will also be capable of deploying and retrieving guests in kayaks. It’s a revolutionary way of experiencing the beauty that Northern Michigan, particularly Pictured Rocks, has to offer. This vision was recognized by our customer, and acted on with development from MIW and our partner architect DLBA. We are ecstatic that they chose MIW for this build, and ecstatic that this vessel will serve tourists who visit the waters of Pictured Rocks.”


The main engines will be twin Cummins QSK19, rated at 800HP each, driving propellers through Twin Disc reduction gears. Twin Seakeeper HD gyro stabilizers will be fitted for passenger comfort and safety. The hull form will be a double chine, variable deadrise monohull for improved seakeeping and efficiency. The vessel’s hull form, structure, machinery, and electrical systems will be designed by DLBA (a division of Gibbs & Cox, Inc.) to meet USCG Subchapter T requirements.


With nearly two months into the project, MIW and PRK are on their way to achieving the goal of launch and delivery in late 2019.

71 views0 comments

Recent Posts

See All
bottom of page