PAST PERFORMANCE

MACHINE, FABRICATE, PAINT, PACKAGE AND DELIVER FOUR (4) DAM GATES FOR STILLHOUSE DAM
DAM GATES
OWNER
LOCATION
WEIGHT
MATERIAL
U.S. Army Corps of Engineers - Subcontracted by Gracon, LLC
Stillhouse Dam, Texas
13,000 lbs each
A588 Plate and A36 Plate Stock
FABRICATE AND DELIVER 100 ALUMINUM DAM BOARDS
DAM BOARDS
OWNER
LOCATION
WEIGHT
MATERIAL
U.S. Fish & Wildlife Service
Pendills/Sullivan Creek - Brimley, MI
2.52 tons
Aluminum
FABRICATE AND DELIVER 96 LOG SCREEN INSERTS - ALL "HOT DIP" GALVANIZED
LOG SCREENS
OWNER
LOCATION
WEIGHT
MATERIAL
Eastern Generation
Astoria, NY
29,440 lbs
3/16" Hot Rolled Carbon Steel
FABRICATE AND DELIVER 100 ALUMINUM DAM BOARDS
COFFERDAM TEMPLATE
OWNER
​
LOCATION
​
U.S. Army Corps of Engineers - Subcontracted by Durocher Marine, a division of Kokosong Construction Company, Inc.
Soo Locks Complex - Sault Ste. Marie, MI
Moran Iron Works fabricated a template for a set of cofferdams. By definition, a cofferdam, sometimes called a coffer, is a temporary enclosure built in water that allows for an area to be pumped out, forming a dry environment for work to be performed. They are typically welded steel structures with cross bracing enclosed in sheet piling.
These cofferdams were built for the Soo Lock Complex, Sault Sainte Marie, Michigan, U.S. Army Corps of Engineers Detroit District. They were used to dewater the locks and allow maintenance and repairs to be performed during the annual lock closure.
“We picked the assembled template, set onfloats, secured in position, set all 12 legs, removed floats, lowered to working level and installed most of the leg bolts. Everything performed better than could reasonably be expected.
All of the Durocher and Moran dimensions match our intent within a fraction of an inch. Actual center of template is within 0.1” of Corps design center so they had the lock walls located rather accurately too. Circumference was measured within 0.25” of theoretical from the Moran shop drawing. This is in over 271 feet! We probably had incorrect tension in the tape. Thanks again for your creativity in the design phase and the excellent workmanship.” - Stan Neff, P.E., Operations Manager, Durocher Marine, a Division of Kokosing Construction Company, Inc.