Job Profile

Project : Dryer Drum Exterior of drum after rolled material sections were seal welded in place.
Job Number : 32016
Client : Goodrich Paving
Destination : Alpena, MI
Duration : 4 weeks
Completion : May 2009
Approx Value : $45,000.00 Welding during fabrication process of rolled materials.
Approx Weight : 18,000 lbs
Ship Date : May 2009
Ship Method : Customer Pickup
Project Description: A complete repair of this Asphalt dryer drum, included the tear down of the unit, in order to replace the drum with 1/2" AR235 Plate, measuring 88" in diameter and 28' in length. The drum was reinforced under the Trunnion Tires with 5/16" AR235 plate and included the fabrication of new flights.
Dryer Drum during final fabrication state. New and repaired flights being mounted. Completed Dryer Drum ready to ship.