| Project : |
WGI Absorber Ductwork 2007 |
|
| Job Number : |
16283 |
| Client : |
Washington Group International |
| Destination : |
Monroe Power Plant Units No. 3 and No. 4, DTE, Monroe, MI |
| Duration : |
36 weeks |
| Completion : |
2008 |
| Approx Value : |
$6.6 Million |
|
| Approx Weight : |
1,000 ton |
| Ship Date : |
Summer 2008 |
| Ship Method : |
Barge Shipped, Insulated and Lagged Duct Modules direct to jobsite. |
| Project Description: |
Fabricated (2) Absorber Ductwork Systems in large modules to facilitate erection efficiency. Installed Free Issue Expansion Joint Frames, included fabrication of (2) ASME welded Quench Piping Systems, and Engineered Lifting Lug systems for erection. All Modules were shop Insulated and Lagged before being loade onto barge. |